[Construction Case] Certain Clinic Checker Plate Replacement Work
This is a case study of replacement work due to corrosion of the septic tank cover and receiving frame in the parking lot.
We would like to introduce a case of replacing the cover of a septic tank in the customer parking lot of a certain clinic. The existing SUS cover and frame at the site were corroded and deteriorated, posing a risk of sagging and falling whenever a vehicle drove over them. We adopted a corrosion-resistant FRP cover that can withstand the weight of vehicles. The existing frame was removed, and a new SUS frame was installed. 【Construction Case】 ■ Production period: Approximately 1.5 months ■ Type of work: Equipment installation ■ Work days: 2 days ■ Date/Location: December 2019/Saitama Prefecture ■ Equipment used: FRP rectangular manhole, SUS frame *For more details, please refer to the PDF document or feel free to contact us.